2026 Regulations All SWMS Templates & Courses updated for 2026 WHS / OSHA Standards.
Home Browse All 40+ Trades SWMS Document Store CPD Accredited Courses Interactive Risk Calculator Safety Guides
⚡ 2026 Compliant SWMS 100% Audit Guaranteed

Demolition & Structural Deconstruction Safe Work Method Statement (SWMS)

High-risk demolition SWMS covering mechanical dismantling, hazardous materials abatement, load drop sequences, and utility isolations.

Format: MS Word (.docx) + Fillable PDF + Risk Matrix (.xlsx)
Pages: 18 Pages
Updated: 2026 Standard Edition
Rating: ★ 4.92 (49 Reviews)
Instant Commercial License
$49.95 $89.95 Save $40.00
Instant download immediately after purchase
Unlimited use across all your company jobs
Fully editable in Microsoft Word & PDF
Pre-filled task steps, hazards & controls
100% Money-Back Audit Guarantee
Interactive Preview Audit-Ready 2026 Format

Look Inside: Sample Document Structure

Explore the exact pre-filled tables, task hazard breakdowns, and risk matrices included in this download.

Job Task Step Potential Hazards Initial Risk Statutory Controls (2026 WHS / OSHA) Residual Person Resp.
1. Site Setup & Inspection Unidentified overhead hazards, trip hazards, unauthorized public entry. Moderate (9) Establish 2m perimeter barricades, display mandatory PPE signage, complete site induction briefing. Low (2) Site Supervisor
2. Scaffold & Edge Rail Erection Falls from height > 2m, dropped scaffold components, structural sway. High (16) Licensed intermediate rigger only, full harness travel restraint, erect guardrails and kickboards before decking. Low (3) Leading Hand
3. Primary Task Execution & Height Work Fragile roof collapse, pendulum effect during fall, electrocution near powerlines. Extreme (20) 15kN certified anchor point, twin-tail shock-absorbing lanyard, 4.3m clearance check, crawl boards on fragile sheets. Low (4) Qualified Tradesperson
4. Tool Handling & Material Hoisting Falling objects striking ground workers, load slip, sling snap. High (15) Mandatory wrist tool lanyards for all hand tools, 3m exclusion drop zone below, taglines on crane loads. Low (2) Dogman / Crane Operator
Principal Contractor: [Company Name / Client Pre-filled]
Document Reference: SWMS-DEMO-2026
Site Location / Project: [Project Address / Stage 1-4]
Revision & Date: Rev 4.2 (2026 Audit Edition)
Designated WHS Officer: [Safety Manager Contact & Phone]
Applicable Legislation: WHS Act 2011/2024 s291 • OSHA 1926
Type 2 Helmet
AS/NZS 1801 w/ chinstrap
Full Body Harness
AS/NZS 1891.1 certified
Safety Goggles
UV400 Anti-fog impact rated
Steel Toe Footwear
Non-slip puncture-proof sole
5-Minute Emergency Height Rescue & Suspension Trauma Retrieval Plan

In the event of an arrested fall, the worker must be retrieved within 5 minutes to prevent irreversible orthostatic suspension shock. Pre-rigged Gotcha rescue kits and emergency ladder lines must be on site before works begin.

🚨 Emergency Services: Dial 000 / 911 Immediately First Aid Station: Level 1 Site Shed
Worker Full Name Trade / Qualification White Card / OSHA No. Worker Signature Date & Time
David Miller Licensed Electrician (A-Grade) WC-94820194 D. Miller 2026-10-08 07:15
Marcus Wright Advanced Scaffolder WC-38291048 M. Wright 2026-10-08 07:20

Document Overview & Scope

Turnkey 2026 Demolition SWMS. Complies with AS 2601 and WHS Regulation 291. Covers sequential structural dismantling, floor loading calculations, utility air-gapping, dust suppression, and public exclusion zones.

What is Included in this Package

Editable MS Word (.docx) + PDF
Structural Sequence Plan
Utility Disconnection Register
Exclusion Zone Protocol

High-Risk Hazards Assessed in this SWMS

Premature building collapse
Falling rubble onto personnel
Live gas/power utility strikes
Hazardous silica and lead dust

Verified Buyer Reviews

Real feedback from licensed contractors and safety officers.

★ 4.92
49 Verified Reviews
David Thornton — Managing Director / Principal Contractor, Thornton Commercial Builders
✓ Verified Buyer
★ ★ ★ ★ ★

Passed WorkSafe Audit with Zero Infringements

We had a random site audit on our \$4.2M commercial project. The inspector reviewed our SWMS and WHSMP documents and complimented the clarity and 2026 regulatory compliance. Downloaded in Word, added our company details in 10 minutes. Outstanding value!

Sarah Jenkins — HSE Compliance Lead, Pacific Heights Roofing Ltd
✓ Verified Buyer
★ ★ ★ ★ ★

Best Safety Templates in Australia & UK

Extremely detailed and thoroughly thought out. The emergency rescue plans and risk assessment matrices are comprehensive. Saves hundreds of hours of drafting.

100% Audit Pass Guarantee

If a builder or safety auditor requests modifications to this template, our WHS team will update it for you free of charge within 24 hours.